2.1 KiB
Executable File
2.1 KiB
Executable File
Roadmap
Current Phase: The Bedrock Phase
Every sentence accepted during this phase is intended to support everything built above it. The specification leads. Everything else follows.
RC2 Objective
Reduce ambiguity without reducing meaning.
RC2 is compression, not expansion. Every refinement should either eliminate ambiguity or strengthen traceability.
RC2 Exit Criteria
RC2 is complete when:
- Every top-level directory has exactly one responsibility.
- Every canonical term has one definition (in OE-0002).
- Every definition survives the Enduring Concept test (Law 5).
- Every example passes the Self-Fading Example principle.
- Every implementation derives from a specification rather than inventing one.
- An independent reviewer can reconstruct the architecture without speaking to the project authors.
Specification Dependency Tree
Charter (OE-0000)
-> Foundation (OE-0001)
-> Core Vocabulary (OE-0002)
-> Engineering Context (OE-0003)
-> Observation (OE-0004)
-> Survey (OE-0005)
-> Understanding (OE-0006)
-> Verification (OE-0007)
-> Decisions (OE-0008)
-> Stewardship (OE-0009)
-> Inheritance (OE-0010)
-> Evolution (OE-0011)
Nothing later may redefine an earlier layer. Only extend it.
Change Workflow
Observe -> Draft -> Review -> Accept -> Freeze (RC) -> Reference
Document status lifecycle: Draft -> Proposed -> RC -> Accepted -> Deprecated (defined in OE-0000).
Future Phases
- Implementation Phase — Interchange formats, context record tooling, presentation layers
- Integration Phase — Context record systems for specific engineering domains
- Community Phase — Open contributions, discipline-specific extensions
Constitutional Gap
OE-0011 acknowledges a gap: the standard defines the change workflow for technical content but not for its own governance (laws, editorial principles, status criteria). This will be addressed in a future amendment.